1. Photo shows the demolition and cleanup of the existing concrete walk and steps.

2. the old walk is now gone and we are laying out the desired shape of the new walk.

3. after the sod is removed where the walk is to go, we dug down 12-18 inches to backfill with crushed gravel

4. The base of crushed gravel with a couple inches of sure-pak have been tamped well and the flex edge has been installed so now it's time to start laying the pavers.

5. Most of the pavers are now in place...just a few more cuts and the walk is complete.

6.  The walk is finished and a few medium sized rocks are to be placed as a small retaining wall for the planting bed.  Once this is done the plants go in and we're all done.